项目完成时间/开始时间
|
项目 |
客户
|
地区
|
工艺描述 / 产能
|
工作范围
|
|
2003
|
Water system utilities
|
TPCA Kolin (Toyota, Peugeot, Citroen)
|
Kolin, Czech Republic
|
Water system including sewage treatment plant.
|
Documentation for planning permission proceedings, building permit documentation, detail design, supervision.
|
|
1999
|
Independent firefighting water system RL 98025.
|
Ceska rafinerska, a.s. Litvinov
|
Litvinov, Czech Republic
|
Review of existing fire extinguishing system in Czech Republic, survey for a new pumping firewater station, new firewater distribution system, foam extinguishing system and construction of product tankfarm in Czech Republic.
|
Elaboration of BDEP, building permit documentation.
|
|
1998
|
Stable fire suppression system.
|
Foster Wheeler
|
Steti, Czech Republic
|
Fire water distribution, portable and semi - stable fire extinguishing device.
|
EPC (Engineering, Procurement, Construction) including erection.
|
|
1997
|
Inventarization of actual waste water treatment system.
|
Ceska rafinerska, a.s. Kralupy
|
Kralupy, Czech Republic
|
Inventarization of actual waste water handling system.
|
Inspection of existing waste water handling system. test results elaborated in the as-built documentation.
|
|
1997
|
Reviewing of existing waste water management system
|
Ceska rafinerska, a.s. Kralupy
|
Kralupy, Czech Republic
|
Review of existing waste water management system.
|
Consulting services.
|
|
1997
|
Cooling circuit for Butadiene production
|
Kaucuk, Kralupy
|
Kralupy, Czech Republic
|
Capacity: 3 000 m3/hour.
|
Feasibility study.
|
|
1997
|
Waste water storage
|
CEZ, Prague Power station Chvaletice
|
Chvaletice, Czech Republic
|
Waste water storage, desulphurization. Capacity: 2x350 m3.
|
EPC (Engineering, Procurement, Construction).
|
|
1997
|
Savage treatment facility
|
CSL- airport Ruzyne - North and South
|
Ruzyne, Czech Republic
|
Rain and sewage water treatment. Capacity: 80 + 100 m3/hour. Actual efficiency : 87 - 93 % (BSK5).
|
Technical-investment study, design package: basic and detail design (civil part), supervision, commissioning.
|
|
1996
|
Cooling system revamp
|
Ceska rafinerska, a.s. Kralupy
|
Kralupy, Czech Republic
|
Capacity: 10 000 m3/hour.
|
Optimisation study.
|
|
1996
|
Oily water separation system for Slapy dam
|
CEZ Prague
|
Slapy, Czech Republic
|
Sewage water treatment plant.¨Capacity: 200 t/day.
|
Basic and detail design, site supervision.
|
|
1996
|
Waste water treatment from biodiesel production.
|
Milo, Olomouc
|
Olomouc, Czech Republic
|
Biological waste water treatment plant. Capacity: 15 t/day.
|
Basic and detail design, site supervision.
|
|
1996
|
Desaltination plant
|
Diamo, Straz pod Ralskem
|
Straz pod Ralskem, Czech Republic
|
Decontamination of acidic underground waste water resulting from underground leaking of Uranium ores by means of reverse electrodialysis, evaporation and crystallisation. Capacity: 330 m3/hour of purified water.
|
Basic and detail design, engineering supply.
|