|
项目完成时间/开始时间
|
项目 |
客户
|
地区
|
工艺描述 / 产能
|
工作范围
|
| 2006 | New plant for production of thermo-mechanical pulp (TMP) and Folding boxboard (FBB) | Biocel Paskov a.s. | Paskov, Czech Republic | New paper machine - capacity of 250 000 t/year of folding boxboard (three layers) | All documentations for construction permit of new capacity (EIA,IPPC, Building permit) with necessary documentations for energie connections |
| 2005 | Study of changes of pulp storing | Biocel Paskov a.s. | Paskov, Czech Republic | Study of changes of pulp storing in storage Biocel Paskov | Study. |
| 2004 | Speed increase of PS 6 - new coating | KRPA Hostinne | Hostinne, Czech Republic | Speed increase of PS 6 - SpeedSizer of Voith firm | Reconstruction of PS 6, Detail Design |
| 2004 | MM Säge plant Paskov | Franz Mayr-Melnhof Säge Holding AG | Austria | Capacity: 700 000 m3 of grading saw logs. Production: 420 000 m3 of sawn wood. | Documentation for: industrial estate, planning permission proceedings, building permit bidding documentation, detail design of civil part. Supervision of the civil part during construction. |
| 1999 | Study of grinding plant revamp | JIP -Papermills, Vetrni a.s. | Vetrni, Czech Republic | Optimatization study for plant capacity upgrade. Capacity extension from 80 t/day up to 210 t/day. | As-built documentation. |
| 1999 | Increase in operation of paper machine | JIP -Papermills, Vetrni a.s. | Vetrni, Czech Republic | Paper machine reconstruction. I. stage: speed increase up to 1 000 m/min. | Environmental impact assessment, documentation for building permit, detail design, engineering, supervision. |
| 1999 | Production and processing of Tissue paper | Biocel, a.s. Paskov | Paskov, Czech Republic | Paper machine. Products: toilette paper, handkerchiefs, kitchen roles and towels. Capacity: 30 000 t/day. | Documentation for building permit, environmental impact assessment, technical support. |
| 1997 | New paper machine fitting - wood pulp production | Biocel, a.s. Paskov | Paskov, Czech Republic | Capacity: 30 000 t/year of tissue paper. | Environmental impact assessment for new paper machine fitting. |
| 1996 | Paper machine reconstruction | KRPA Krkonosske papery, a.s. | Hostinne, Czech Republic | Paper machine reconstruction. I. stage: speed increasing up to 400 m/min, outlook for the future 500 m/min. | Detail design, co-ordination and engineering services, supervision, as-built documentation. |