| 2005 | Boilers, 100 t/h | NRC | Baiji, Iraq | Change of 2 boilers for the reconstruction. | P |
| 1999 | Boiler R 200 and VPR 200 revamp | Chemopetrol, a.s., Cheminvest | Litvinov, Czech Republic | Replacement of existing supply T 200, replacement of existing underground line to new designed cable bridges. | Documentation for general planning proceedings, building permit documentation. |
| 1998 | Power station Porici Trutnov - Boiler K8 | CdF Ingeniere Merlebach, France | Porici u Trutnova, Czech Republic | Construction includes: boiler house, lime stone silo, electrostatic precipitator, compression station extension, electrostatic air filters. | EPC (Engineering, Procurement, Construction) of civil part - K8: detail design, project management, subcontractors tendering, procurement, civil part, construction and supervision. |
| 1998 | Boiler K11 revamp | Foster Wheeler | Steti, Czech Republic | Silos 500, 800 and 1200 m3. | EPC (Engineering, Procurement, Construction) including erection of silos and fumeduct. |
| 1998 | Boiler K11 revamp | Assi Doman, a.s. Sepap | Steti, Czech Republic | Boiler K 11 revamp | Documentation for planning and building permits issuing, basic and detail design. |
| 1997 | Boiler revamp and coal handling system revamp. - BIVOJ | Prazska teplarenska, a.s. | Praha Malesice, Czech Republic | Reconstruction of 2 granulating plants for black coal processing and handling. Capacity: 2x160 t/hour. | Subcontractor tendering and tendering assessment, documentation for planning and building permits, supervision, engineering. |
| 1997 | Range development of heat station Holesovice | Prazska teplarenska | Praha Holesovice, Czech Republic | Civil, area and architectural management of the factory and its external links, especially Prague 7 district heating network. Investment and operating costs. | Study of the general expansion at the heat station Holesovice. |
| 1994 | Distribution station 110 kW | Power plant Pocerady | Pocerady, Czech Republic | Delivery of distribution point 100 kW and main pipe rack. | EPC (Engineering, Procurement, Construction). |