| 2003 | Municipal incinerator Brno | SAKO Brno, a.s. | Brno, Czech Republic | Incinerator reconstruction. Capacity: 200 000 MTPY of municipal waste. | Design, environmental impact assessment, building permit. |
| 2000 | Reduction of emission | SAFINA, a.s. Vestec | Vestec, Czech Republic | Elimination of air pollutants resulting from processing of material containing precious metals. | Technical assistance, detail design, EPC (Engineering, Procurement, Construction), commissioning. |
| 1999 | Coke gas desulphurization | RIA Brno for Trinec steelmill | Trinec, Czech Republic | Capacity: 37 500 Nm3/hour. Outlet: H2S - less than 300 mg/ Nm3, NH3 - less than 35 mg/ Nm3. Process licence: Krupp Uhde, SRN, VACASULF process. | Basic and detail design, complex testing, commissioning. |
| 1999 | Coking plant renewal Coke gas desulphurization | Nova Hut, a.s., Ostrava | Ostrava, Czech Republic | Capacity: 75 000 Nm3/hour. Coke gas desulphurization: H2S - less than 300 mg/ Nm3, NH3 - less than 35 mg/ Nm3. Process licence: Krupp Uhde, SRN, AMASULF-COMBICLAUS process. | EPC (Engineering, Procurement, Construction). |
| 1998 | Incinerator EPI | Chemical and Metallurgical Association, a.s. | Usti nad Labem, Czech Republic | Modification of absorption to conform the chlorine emission limit required by the Czech authorities. | Study, as-built documentation, pilot plant test. |
| 1998 | Ash handling | Assi Doman, a.s. Sepap | Steti, Czech Republic | Ash (wet) transport from new fly ash and bottom ash silos of CFB boiler K11 to the existing ash handling building. | Design documentation. |
| 1998 | Environmental precautions in Benzine handling | Barum continental | Otrokovice, Czech Republic | Hermetization of spray mixing tanks. Benzine vapours reversion. | Detail design, supervision. |
| 1998 | Power plant - Melnik I desulphurization | Energotrans, a.s., Prague | Horni Pocaply, Czech Republic | Desulphurization of 6 blocks of Melnik I power station, production of Energo Gypsum, fly ash handling. Capacity: 6x55 MW. | Consulting and engineering services, contractor bidding and selection, contracting assistance, various activities during realisation of construction, commissioning and guarantee test. |
| 1998 | Coke gas desulphurization | Power plant Opatovice | Opatovice, Czech Republic | Desulphurization plant, fly ash handling, stabilizate production, stabilizate transport and lay out, revamp of existing unloading station, communication network, provision of discharge station Bukovina. Process licence: JGC, Kawasaki, CSI. | Feasibility study, bidding documents for tendering, checking of contractor basic and detailed design, service and start-up instructions, noise exposure impact study, environmental impact assessment, consultancy, advisory and control services, postcontract services, site supervision.v |
| 1997 | Power plant desulphurization, Tusimice II | CEZ, a.s., Prague | Tusimice, Czech Republic | Flue gas desulphurization (4 blocks of capacity: 200 MW each). Process licence: Chioyda Japany. | Tender documentation, contractor selection, project for planning and building permit, commercial and technical assistance, consulting services. |
| 1997 | Environmental impact assessment | various clients (Czech Republic) | various | Energetic and chemical industry, gas processing, pulp and paper industry, environmental constructions. | Environmental impact assessment. |
| 1997 | Coke gas desulphurization | Power plant Chvaletice | Chvaletice, Czech Republic | Desulphurization using wet limestone process. Capacity: 4x200 MW. | Bidding documents for tendering, postcontract services. |
| 1997 | Fly ash handling | CEZ, Prague Power plant Melnik II and III | Horni Pocaply, Czech Republic | Fly ash handling, transport and storing in silos (2x6000 m3), mixing of fly ash with water and conveying to the rail. Capacity: 432 t/year. | EPC (Engineering, Procurement, Construction). |
| 1997 | Coke gas desulphurization | Power plant Detmarovice | Detmarovice, Czech Republic | Desulphurization using wet limestone process, stabilizate production, transport and lay up. Process licence: Mitsubishi. | Bidding documents for tendering, planning and building permit documentation, consulting service, postcontract services. |
| 1997 | Coke gas desulphurization | Power plant Vojany | Vojany, Czech Republic | Fluidised bed boiler. | Bidding documents for tendering, contract adjustment, planning and building permit documentation. |
| 1997 | Coke gas desulphurization and gypsum handling | Energotrans, a.s., Prague CEZ a.s. | Horni Pocaply, Czech Republic | EME I: optimisation of ecology, waste treatment, plot plan, railway capacity. EME II: utilisation of energy gypsum, ash handling and transport, limestone milling. | Study, bidding documents for tendering, dispersion study, preparation of the site. |
| 1997 | Heating plant desulphurization | CHZ Litvinov | Litvinov, Czech Republic | Desulphurization by wet limestone process, boiler K13 to K17 revamp, sludge incineration 700. Capacity: 200 MW. Process licence: Bischoff. | Subcontractor selection, building permit documentation, documentation of civil part, noise exposure and dispersion study, environmental impact assessment, process coordination, stabilizate production procurement. |
| 1996 | Stabilizate production | Chemopetrol, a.s. | Litvinov, Czech Republic | Ash and gypsum mixing and storage. Stabilizate handling and disposal. Capacity: 2x90 t/hour of stabilizate | EPC (Engineering, Procurement, Construction), apart from civil part. |
| 1994 | Flue gas desulphurization | Power plant Pocerady | Pocerady, Czech Republic | Desulphurization by wet limestone process, lay up of limestone, energy-gypsum production. 2. Construction: 2x200 MW 3. Construction: 1x200 MW Process licence: Hoogvens. | Study, bidding documents for tendering, documentation for planning and building permit, selection of contractor, dispersion study. |
| 1993 | Boiler K1 and K2 desulphurization | Heating plant Plzen | Plzen, Czech Republic | Desulphurization by semi-dry limestone process. | Bidding documents for tendering. |
| 1993 | Coke gas desulphurization | Bischoff | Prunerov, Czech Republic | Process licence: Bischoff. | Elaboration of selected parts of design documentation. civil part and selected mechanical parts. |
| 1993 | Coke gas desulphurization | Power plant Prunerov II | Prunerov, Czech Republic | Capacity: 5x210 MW , desulphurization by wet limestone process, ENERGO gypsum production. Process licence: Mitsubishi. | Project documentation ,consultancy and engineering services, contractor tendering and selection, contracting assistance. |
| 1993 | Coke gas desulphurization | Power plant Prunerov I | Prunerov, Czech Republic | Capacity: 4x110 MW, desulphurization by wet limestone process, ENERGO gypsum production. Process licence: Bischoff. | Contractor bidding and selection, documents for planning and building permit, contracting assistance. |
| 1990 | Repository | Nuclear Power station Mochovce | Mochovce, Czech Republic | Low radiance deposit. | Complete design package. |