2003 Municipal incinerator Brno SAKO Brno, a.s. Brno, Czech Republic Incinerator reconstruction. Capacity: 200 000 MTPY of municipal waste. Design, environmental impact assessment, building permit.
2000 Reduction of emission SAFINA, a.s. Vestec Vestec, Czech Republic Elimination of air pollutants resulting from processing of material containing precious metals. Technical assistance, detail design, EPC (Engineering, Procurement, Construction), commissioning.
1999 Coke gas desulphurization RIA Brno for Trinec steelmill Trinec, Czech Republic Capacity: 37 500 Nm3/hour. Outlet: H2S - less than 300 mg/ Nm3, NH3 - less than 35 mg/ Nm3. Process licence: Krupp Uhde, SRN, VACASULF process. Basic and detail design, complex testing, commissioning.
1999 Coking plant renewal Coke gas desulphurization Nova Hut, a.s., Ostrava Ostrava, Czech Republic Capacity: 75 000 Nm3/hour. Coke gas desulphurization: H2S - less than 300 mg/ Nm3, NH3 - less than 35 mg/ Nm3. Process licence: Krupp Uhde, SRN, AMASULF-COMBICLAUS process. EPC (Engineering, Procurement, Construction).
1998 Incinerator EPI Chemical and Metallurgical Association, a.s. Usti nad Labem, Czech Republic Modification of absorption to conform the chlorine emission limit required by the Czech authorities. Study, as-built documentation, pilot plant test.
1998 Ash handling Assi Doman, a.s. Sepap Steti, Czech Republic Ash (wet) transport from new fly ash and bottom ash silos of CFB boiler K11 to the existing ash handling building. Design documentation.
1998 Environmental precautions in Benzine handling Barum continental Otrokovice, Czech Republic Hermetization of spray mixing tanks. Benzine vapours reversion. Detail design, supervision.
1998 Power plant - Melnik I desulphurization Energotrans, a.s., Prague Horni Pocaply, Czech Republic Desulphurization of 6 blocks of Melnik I power station, production of Energo Gypsum, fly ash handling. Capacity: 6x55 MW. Consulting and engineering services, contractor bidding and selection, contracting assistance, various activities during realisation of construction, commissioning and guarantee test.
1998 Coke gas desulphurization Power plant Opatovice Opatovice, Czech Republic Desulphurization plant, fly ash handling, stabilizate production, stabilizate transport and lay out, revamp of existing unloading station, communication network, provision of discharge station Bukovina. Process licence: JGC, Kawasaki, CSI. Feasibility study, bidding documents for tendering, checking of contractor basic and detailed design, service and start-up instructions, noise exposure impact study, environmental impact assessment, consultancy, advisory and control services, postcontract services, site supervision.v
1997 Power plant desulphurization, Tusimice II CEZ, a.s., Prague Tusimice, Czech Republic Flue gas desulphurization (4 blocks of capacity: 200 MW each). Process licence: Chioyda Japany. Tender documentation, contractor selection, project for planning and building permit, commercial and technical assistance, consulting services.
1997 Environmental impact assessment various clients (Czech Republic) various Energetic and chemical industry, gas processing, pulp and paper industry, environmental constructions. Environmental impact assessment.
1997 Coke gas desulphurization Power plant Chvaletice Chvaletice, Czech Republic Desulphurization using wet limestone process. Capacity: 4x200 MW. Bidding documents for tendering, postcontract services.
1997 Fly ash handling CEZ, Prague Power plant Melnik II and III Horni Pocaply, Czech Republic Fly ash handling, transport and storing in silos (2x6000 m3), mixing of fly ash with water and conveying to the rail. Capacity: 432 t/year. EPC (Engineering, Procurement, Construction).
1997 Coke gas desulphurization Power plant Detmarovice Detmarovice, Czech Republic Desulphurization using wet limestone process, stabilizate production, transport and lay up. Process licence: Mitsubishi. Bidding documents for tendering, planning and building permit documentation, consulting service, postcontract services.
1997 Coke gas desulphurization Power plant Vojany Vojany, Czech Republic Fluidised bed boiler. Bidding documents for tendering, contract adjustment, planning and building permit documentation.
1997 Coke gas desulphurization and gypsum handling Energotrans, a.s., Prague CEZ a.s. Horni Pocaply, Czech Republic EME I: optimisation of ecology, waste treatment, plot plan, railway capacity. EME II: utilisation of energy gypsum, ash handling and transport, limestone milling. Study, bidding documents for tendering, dispersion study, preparation of the site.
1997 Heating plant desulphurization CHZ Litvinov Litvinov, Czech Republic Desulphurization by wet limestone process, boiler K13 to K17 revamp, sludge incineration 700. Capacity: 200 MW. Process licence: Bischoff. Subcontractor selection, building permit documentation, documentation of civil part, noise exposure and dispersion study, environmental impact assessment, process coordination, stabilizate production procurement.
1996 Stabilizate production Chemopetrol, a.s. Litvinov, Czech Republic Ash and gypsum mixing and storage. Stabilizate handling and disposal. Capacity: 2x90 t/hour of stabilizate EPC (Engineering, Procurement, Construction), apart from civil part.
1994 Flue gas desulphurization Power plant Pocerady Pocerady, Czech Republic Desulphurization by wet limestone process, lay up of limestone, energy-gypsum production. 2. Construction: 2x200 MW 3. Construction: 1x200 MW Process licence: Hoogvens. Study, bidding documents for tendering, documentation for planning and building permit, selection of contractor, dispersion study.
1993 Boiler K1 and K2 desulphurization Heating plant Plzen Plzen, Czech Republic Desulphurization by semi-dry limestone process. Bidding documents for tendering.
1993 Coke gas desulphurization Bischoff Prunerov, Czech Republic Process licence: Bischoff. Elaboration of selected parts of design documentation. civil part and selected mechanical parts.
1993 Coke gas desulphurization Power plant Prunerov II Prunerov, Czech Republic Capacity: 5x210 MW , desulphurization by wet limestone process, ENERGO gypsum production. Process licence: Mitsubishi. Project documentation ,consultancy and engineering services, contractor tendering and selection, contracting assistance.
1993 Coke gas desulphurization Power plant Prunerov I Prunerov, Czech Republic Capacity: 4x110 MW, desulphurization by wet limestone process, ENERGO gypsum production. Process licence: Bischoff. Contractor bidding and selection, documents for planning and building permit, contracting assistance.
1990 Repository Nuclear Power station Mochovce Mochovce, Czech Republic Low radiance deposit. Complete design package.