| 2005 | Revamp of sulphuric acid unit | Spolana, Neratovice | Neratovice, Czech Republic | Outkumpu. | Documentation for building permit. |
| 2005 | Production of TBA | DUSLO a.s., Sala | Sala, Slovakia | New unit construction. Capacity: 6000t/y. | Technical and economical study. |
| 2003 | Polyphenylenether unit | Ruicheng First Chemical, Ltd. | Shanxi Province, China | New Polyphenylenether production unit. Process know-how is supplied by Cheminvex, s.r.o., Czech Republic. Capacity: 32 MTPD (10 000 MTPY) of polyphenylenether. | Extended basic design, procurement, consultancy, supply of proprietary equipment, supervision at the site and during commissioning period. |
| 2003 | Polypropylene plant | Linde/ Slovnaft | Slovakia | New Polypropylene (PP) plant and Offsites. | Detail design for civil part and steel structures related with PP ISBL. EPC PP pellet silos storage facilities - civil, steel structures, electrical & instrumentation. |
| 2001 | Intensification of granulate production | Chemopetrol | Litvinov, Czech Republic | Pneumatic and hydraulic transport of fly ash from T700 to silos. | EPC (Engineering, Procurement, Construction). |
| 2001 | Sulphuric unit reconstruction - refinery Novopolock | Unis/ Naftan Novopolock | Belarus | Revamping of Sulphuric acid plant. | Basic and detail design of SO2 conversion reactor. |
| 2001 | Sulphuric acid unit | Precheza, a.s. | Prerov, Czech Republic | Sulphuric acid plant intensification. Capacity increase from 340 t/day to 410 Mt/day. Process licence: Monsanto. | EPC (Engineering, Procurement, Construction). |
| 2000 | Intensification and renovation of low-pressure polyethylene | Chemopetrol | Litvinov, Czech Republic | Hexene and hexane loading and storage for new Polyethylene production unit. | Detail design. |
| 2000 | Production of NPK fertiliser | Lovochemie, a.s., Lovosice | Lovosice, Czech Republic | Elimination of ammonia and hydrogen fluoride from waste gases from production of NPK fertiliser. | EPC (Engineering, Procurement, Construction): study, pilot plant test, detail design, supervision, commissioning, start-up. |
| 2000 | Vacuum system revamp | Chemicke zavody, a.s., Sokolov | Sokolov, Czech Republic | Replacement of steam jet and air jet ejectors for vacuum pumps. | EPC (Engineering, Procurement, Construction): detail design, Engineering. |
| 1999 | Sulphuric acid unit | Industries Chimiques du Senegal | Senegal | Sulphuric acid plant . Capacity: 3000 Mt/day. | Detail design of piping and mechanical part, civil part, electrical part and steel structure plant. |
| 1999 | Phosphoric acid unit | Industries Chimiques du Senegal | Senegal | Phosphoric acid plant Capacity: 1015 Mt/day. | Detail design of piping and mechanical part, civil part, electrical part and steel structure plant. |
| 1997 | Finishing of Hydrogenation plant construction | Synthesia, a.s. | Pardubice - Semtin, Czech Republic | Finalisation and completion of unit for hydrogenation of solid particles in melt and solution. | Design documentation for building permit, detail design, supervision. |
| 1997 | Hydrogenation plant | Synthesia, a.s. | Pardubice -Semtin, Czech Republic | Complementary construction of Hydrogenation reactor. Volumes of reactors - 2x4 m3 and 1x7 m3. | Project documentation for building permit, detail designs, coordination engineering, supervision. |
| 1997 | Hydrogen peroxide unit | Krebs, France | Aragonesas, Spain | Hydrogen peroxide production. Capacity: 10 000 t/year. Process licence: Krebs. | Detail design of piping. |
| 1996 | Ammonia storage | Vitkovice, a.s., Power engineering for Spolana, a.s. | Neratovice, Czech Republic | Dismantling of existing vessel and installation of new ball vessel. Capacity: 2x1 000 m3. | Detail design including control system, electrical and civil part, complex testing, operating manual, as-built documentation, design package, supervision. |
| 1996 | White gypsum separation | Precheza Prerov | Prerov, Czech Republic | Calcium sulphate resulting from the titanium white production as by-product is separated from the waste water flow and converted into commercial type of white gypsum. Capacity: 74 000 t/year. | Documents for planning and building permit, detail design, supervision. |
| 1996 | Glycol storage | Velvana, a.s. | Velvary, Czech Republic | Unloading of glycol from car-tanks, transferring into 3 tanks (capacity of each: 498 m2) and further transport to production line. | Site development plan for building permit, detail design, supervision. |
| 1996 | Phosphate fertiliser filtration | Fosfa, Breclav- Postorna | Postorna Czech Republic | Filter press of dinatrium - hydrogen - phosphate suspension and filter press of neutralising calcium and phosphoric sludge. Capacity: 5 t/ h. | Design package, supervision. |
| 1995 | Acetylene production and loading | Aga Gas, Prague | Kladno Czech Republic | Capacity: 1000 t/y. | Study + environmental impact assessment for implementation of technology. basic construction specifications, mechanical and technology layout, electro part. |
| 1995 | Reconstruction of sulphuric acid unit | Lebanon Chemical | Lebanon | Capacity: 1500 MTPD. | DD |
| 1994 | Gama - butyrobetaine unit | Synthesia, a.s. | Pardubice - Semtin Czech Republic | Batch production of gama-butyrobetaine including material and end product storage. End product is used in production of Carnitin. | Design documentation for building permit, detail design, supervision, environmental impact assessment. |
| 1993 | Monochloracetic acid | China National Chemical Corporation | Fuxin Liaoniong, China | Continuous catalytic acetic acid chlorinating, storing, packing, shipping. Capacity: 10 000 t/year. By-product: HCl (98%). | Basic design elaborated on the laboratory research basis, commissioning, supervision, test run and start-up assistance. |