| 2007 | Biodiesel unit Oil treatment | MEROCO, a.s. Slovakia | MEROCO, a.s., Slovakia | Acid Degumming unit. Sunflower oil dewaxing unit. Physical deacidification of degummed oil. Three - stage continual estherification of neutralised oil to methyl ester Capacity: 100 kt/year. Technology: Desmet Ballestra. | Turn key |
| 2007 | Biodiesel unit Oil treatment | SETUZA, a.s., Usti nad Labem, Czech Republic | SETUZA, a.s., Usti nad Labem, Czech Republic | Physical deacidification of degummed oil. Three - stage continual estherification of neutralised oil to methyl ester Capacity:100 kt/year. Technology: Desmet Ballestra. | Turn key |
| 2006 | New factory for production of thermo-mechanical pulp (TMP) and Folding boxboard (FBB) | Biocel Paskov a.s. | Paskov, Czech Republic | New paper machine - capacity of 250 000 t/year of folding boxboard (three layers). | All documentations for construction permit of new capacity (EIA,IPPC, Building permit) with necessary documentations for energie connections. |
| 2005 | Biodiesel unit | SETUZA, a.s., Usti nad Labem, Czech Republic | STZ Mydlovary, Czech Republic | Intesification of the unit from 12 kt/year up to 30 kt/year and modification from batch to semi-continual production with STZ+SEPARA Brno technology. | EP (FS, EIA, BP, IPPC) |
| 2005 | Biodiesel unit | SETUZA, a.s., Usti nad Labem, Czech Republic | STZ Olomouc, Czech Republic | Intensification of the unit from 30 kt/year up to 50 kt/year and modification from batch to semi-continual production with STZ+SEPARA Brno technology. | EP (FS, EIA, BP, IPPC) |
| 2005 | Urea unit | Duslo, a.s. Sala | Sala, Slovakia | Reconstruction and intensification study in two alternatives. | TES feasibility study. |
| 2005 | Urea plant | Chemopetrol, a.s., Litvinov | Litvinov, Czech Republic | Product quality improvement. | Feasibility study. |
| 2005 | Nitric acid | BorsodChem, MCHZ, s.r.o | Ostrava, Czech Republic | Single/dual pressure, HNO3 concentration of 60%, 800 MTPD. | TES (feasibility study). |
| 2005 | Renewal of hydrogen unit for aniline production | BorsodChem, MCHZ, s.r.o | Ostrava, Czech Republic | Construction of new hydrogen unit. Capacity: 40 thousands t/year. | EPC |
| 2005 | Operation renewal of chamber K 11 and D distillation | Ceska rafinerska, a.s. (UNIPETROL RAFINÉRIE a.s.) | Rafinerie Litvinov, Czech Republic | High-pressure hydrogenation of 24 t/hour vacuum distillate including distillation. Production of Hydrogenated Oils for ethylen unit and Production of Oils. | Execution of complete inspection of performed equipment in mechanical, civil, electrical part and control system and field instrumentation including basic design engineering package for putting into stream of chamber and distillation. |
| 2005 | TBA (terc-buthylamine) production | Duslo, a.s., Sala | Sala, Slovakia | Construction of a new plant. Capacity: 6000 MTPY. | Feasibility study. |
| 2005 | Production of TBA | Duslo, a.s., Sala | Sala, Slovakia | New unit construction. Capacity: 6000 t/year. | Technical and economical study. |
| 2005 | Study of changes of pulp storing | Biocel Paskov a.s. | Paskov, Czech Republic | Changes of pulp storing in the main storage in Biocel Paskov a.s. | Study |
| 2005 | Intensification of Aniline unit | BorsodChem MCHZ, s.r.o. | Ostrava, Czech Republic | Intensification of Aniline production plant. New Hydrogenation unit, new Hydrogen unit and waste water treatment facilities. Capacity: 473 MTPD (150 000 MTPY) of aniline. | Authority engineering and basic design. EPC (Engineering, Procurement, Construction) contract related to the Hydrogenation unit. |
| 2004 | Oxo products loading to trucks | Chemopetrol, a.s. | Litvinov, Czech Republic | Loading place for oxo products loading to trucks, upper loading - PC automatic control. Loading capacity: 30 m3/hour. | EPC (Engineering, Procurement, Construction). |
| 2004 | Glycerine unit | SETUZA, a.s. | Ústí nad Labem, Czech Republic | Glycerine production and purification from waste water from FAME production. Capacity: processing of glycerine waters 90 MTPD. Reaching the yield of glycerine quality 99,6 -99,8% in range of 8000 - 10 800 MTPY. Process license: Cimbria Sket Gmbh. | EPC |
| 2004 | Storage construction of diesel oil | Ministry of Defence Czech Republic | Roudnice nad Labem, Czech Republic | Entry, storage and handling of diesel oil. Storage capacity: 2x5000 m3. | Planning permit documentation, planning permission, documentation for building permit, obtaining of building permit, documentation for supplier selection in international bidding process, detail design, supervision, documentation for complex testing and pre-commissioning, as-built documentation. |
| 2004 | 2AF22024 Storage of jet oil | Ministry of Defence Czech Republic | Air base Namest nad Oslavou, Czech Republic | Entry, storage and handling of jet oil. Storage capacity: 4x1000 m3. | Documentation for building permit, obtaining of building permit, documentation for supplier selection in international bidding process, detail design, supervision, documentation for complex testing and pre-commissioning, as-built documentation. |
| 2004 | Speed increase of PS - new coating | KRPA Hostinné | Hostinné, Czech Republic | Speed increase of PS - SpeedSizer of Voith firm. | Reconstruction of PS6 Detail Design. |
| 2003 | Intensification of aniline unit | BorsodChem, MCHZ, s.r.o | Ostrava, Czech Republic | Construction of new hydrogen train and new hydrogen unit. Capacity: 150 000t/year. | Turn key. |
| 2003 | Heat feeder - Invalidovna | Prazska teplarenska | Prague, Czech Republic | Heat distribution pipeline 2xDN300 in pre-insulated pipe, 3,0 km long, heat exchange station (9x). | Building permit documentation, detail design for TENZA a.s. |
| 2003 | Connection change of boiler HK5 Treboradice | Prazska teplarenska | Prague, Czech Republic | Boiler connection to heat feeder Melnik-Prague. | Building permit documentation, tender, building permit, detail design for Potrubi a.s. |
| 2003 | Horni Pocernice boiler-house connection to Prague heat supply | Prazska teplarenska | Prague, Czech Republic | Heat distribution pipeline 2xDN200-150 inpre-insulated pipe, 4,0 km long. | Documentation for planning permission proceedings, building permit documentation, engineering (planning permission, building permit, tree felling). |
| 2003 | Polypropylene plant | Linde/ Slovnaft | Slovakia | New Polypropylene (PP) plant and Offsites. | Detail design for civil part and steel structures related with PP ISBL. EPC PP pellet silos storage facilities - civil, steel structures, electrical & instrumentation. |
| 2003 | Municipal incinerator Brno | SAKO Brno, a.s. | Brno, Czech Republic | Incinerator reconstruction. Capacity: 200 000 MTPY of municipal waste. | Design, environmental impact assessment, building permit. |
| 2003 | Connection of heat central supply system Neratovice to Prague heat supply | Potrubi a.s. | Prague, Czech Republic | Heat distribution pipeline 2xDN300 in pre-insulated pipe, 3,0 km long, lift station. | Detail design, as-built documentation. |
| 2003 | TN Olsanska reconstruction | Prazska teplarenska | Prague, Czech Republic | Heat distribution pipeline 2xDN300 in pre-insulated pipe, 1,1 km long. | Documentation for planning permission proceedings, building permit documentation, detail design for Greentherm s.r.o. |
| 2003 | Offsites for Nitric acid unit | Lovochemie, a.s. | Lovosice, Czech Republic | Nitric acid manufacture unit - storage facilities. Capacity: 6 000 m3. | Documentation for building permit, detail design of the electrical, instrumentation part, delivery of the civil part, deliveries and assembly of technology, electrical. |
| 2003 | Pipelines centre control (by GSM network) | ČEPRO a.s. | Line part -Bohemia and Moravia (Czech Rep.) | Valve station reconstruction for sections of CEPRO pipelines network. | Preliminary and detail design. |
| 2003 | Intensification of granulate production | Chemopetrol | Litvinov, Czech Republic | Pneumatic and hydraulic transport of fly ash from T700 to silos. | EPC (Engineering, Procurement, Construction). |
| 2003 | Water system utilities | TPCA Kolin (Toyota, Peugeot, Citroen) | Kolin, Czech Republic | Water system including sewage treatment plant. | Documentation for planning permission proceedings, building permit documentation, detail design, supervision. |
| 2003 | Nitric acid unit | Lovochemie, a.s. | Lovosice, Czech Republic | Nitric acid 60%, mono-pressure process 7,5 bar. Capacity: 900 MTPD (100% HNO3). Process licence: Grande Paroisse. | EPC (Engineering, Procurement, Construction): basic and detail design, deliveries of equipment and technology, erection, start-up, guarantee test. |
| 2003 | Shutdown 2001 | Ceska rafinerska | Refinery Litvinov, Czech Republic | Reconstruction of sampling places in refinery Litvinov. | EPC (Engineering, Procurement, Construction). |
| 2002 | Ethylbenzene pipeline reparation, Litvinov - Kralupy nad Vltavou | KAUCUK a.s. | Kralupy nad Vltavou, Czech Republic | Ethylbenzene pipeline DN150 reparation and renovation, 72 km long. | Building permit documentation. |
| 2002 | Connection of LETOV Letnany facility to heat central supply | Prazska teplarenska | Prague, Czech Republic | Heat distribution pipeline 2xDN250-100 in pre-insulated pipe, 1,5 km long. | Documentation for planning permission proceedings, building permit documentation, detail design of part I for PSVS a.s. |
| 2002 | Polyolefin storage | Chemopetrol, a.s. | Litvinov, Czech Republic | New high-capacity storage equipment for granulated PE and PP inclusive of expedition section. Total storage capacity: 9 000 t, 3 600 t in silos. | EPC (Engineering, Procurement, Construction). documentation, deliveries, erection, site management. |
| 2002 | Asphalts loading to trucks | Ceska rafinerska | Refinery Litvinov, Czech Republic | Extension and renovation of asphalts loading to trucks. | EPC (Engineering, Procurement, Construction). |
| 2001 | New prilling buckets | Chemopetrol, a.s. Litvinov | Litvinov, Czech Republic Stamicarbon design. | Capacity: 600 t/day. | Engineering, delivery. |
| 2001 | Silica activation unit | Linde/ Chemopetrol, a.s. | Litvinov, Czech Republic | Activation of Silica (Polyolefin catalyst carrier). Capacity: 500 kg/ d (two process units; 250 kg/ d each). | Extended basic design, detail design, procurement, delivery, erection, commissioning, start-up. |
| 2001 | Tankfarm A reconstruction | Ceska rafinerska | Refinery Litvinov, Czech Republic | Asphalts tankfarm reconstruction - pumping station and piping distribution system. | EPC (Engineering, Procurement, Construction). |
| 2001 | Intensification and renovation of low-pressure polyethylene | Chemopetrol | Litvinov, Czech Republic | Hexene and hexane loading and storage for new Polyethylene production unit. | Detail design. |
| 2001 | Sulphuric acid unit | Precheza, a.s. | Prerov, Czech Republic | Sulphuric acid plant intensification. Capacity increase from 340 t/ day to 410 Mt/ day. Process licence: Monsanto. | EPC (Engineering, Procurement, Construction). |
| 2000 | Reduction of emission from urea production 1st. stage. | Chemopetrol, a.s., Litvinov | Litvinov, Czech Republic | Project of reduction of ammonia emission from wet-process. VT washer (max. 500g NH3/ hour), NT recirculation and urea solution processing (max. 500g NH3/ hour). | EPC (Engineering, Procurement, Construction) including civil part, operating manual, procurement, construction, site supervision, commissioning. |
| 2000 | Production of NPK fertiliser | Lovochemie, a.s., Lovosice | Lovosice, Czech Republic | Elimination of ammonia and hydrogen fluoride from waste gases from production of NPK fertiliser. | EPC (Engineering, Procurement, Construction). |
| 2000 | Vacuum system revamp | Chemicke zavody, a.s., Sokolov | Sokolov, Czech Republic | Replacement of steam jet and air jet ejectors for vacuum pumps. | EPC (Engineering, Procurement, Construction): detail design, Engineering. |
| 2000 | Reduction of emission | SAFINA, a.s. Vestec | Vestec, Czech Republic | Elimination of air pollutants resulting from processing of material containing precious metals. | Technical assistance, detail design, EPC (Engineering, Procurement, Construction), commissioning. |
| 2000 | Carbohydrate storage, RL-9607 | Ceska Rafinerska, a.s. Litvinov | Litvinov, Czech Republic | Revamping of existing underground storage tanks and LPG store, construction of new VNR, LPG pump stations and loading of LPG into trucks (rail and road). | EPC (Engineering, Procurement, Construction), detail design. |
|
项目完成时间/开始时间
|
项目 |
客户
|
地区
|
工艺描述 / 产能
|
工作范围
|
| 1999 | Pipeline (crude oil) DRUZBA renovation | Vodni stavby Praha | Line part -Bohemia and Moravia (Czech Rep.) | Valve and pumping station of pipeline Druzba reconstruction. | Procurement services. |
| 1999 | Study of grinding plant revamp | Vetrni, Papermills | Vetrni, Czech Republic | Optimatization study for plant capacity upgrade. Capacity extension from 80 t/ day up to 210 t/ day. | As-built documentation. |
| 1999 | Intensification of Aniline production | MCHZ Ostrava | Ostrava, Czech Republic | Intensification of aniline production from 75 kt/ year up to 110 kt/ year. Nitrobenzene production - company Plinke. Revamping of: Nitrobenzene clarification unit, loading and unloading of storage tanks. Reconstruction of material and end product storage. | Design documentation for building permit, detail design, supervision. |
| 1999 | Boiler R 200 and VPR 200 revamp | Chemopetrol, a.s., Cheminvest | Litvinov, Czech Republic | Replacement of existing supply T 200, replacement of existing underground line to new designed cable bridges. | Documentation for general planning proceedings, building permit documentation. |
| 1999 | Paper machine | Vetrni Papermills | Vetrni, Czech Republic | Paper machine reconstruction. I. stage: speed increase up to 1 000 m/ min. | Environmental impact assessment, documentation for building permit, detail design, engineering, supervision. |
| 1999 | Tissue paper | Biocel, a.s. Paskov | Paskov, Czech Republic | Paper machine. Products: toilette paper, handkerchiefs, kitchen roles and towels. Capacity: 30 000 t/ day. | Documentation for building permit, environmental impact assessment, technical support. |
| 1999 | New control centre | Armabeton, a.s. for Ceska rafinerska, a.s. | Litvinov, Czech Republic | Construction of new control centre for centralised process supervision. | Planning and building permit documentation, detail design. |
| 1999 | Nitric acid unit | Duslo, a.s., Sala | Sala, Slovak Republic | Nitric acid - 60% by weight, mono-pressure process (p = 7,5 bar). Denitrification of waste gases on DENOX catalyst. Final concentration of NOx lower than 100 PPM, concentration of NH3 lower than 5 PPM. Capacity: 900 t/day (100% HNO3). Process licence: Grande Paroisse. | EPC (Engineering, Procurement, Construction). Detail design including civil part, operating manual, procurement and construction, site supervision, commissioning assistance. |
| 1999 | Fuel depot - Moravian steel - mill | ŐMV, Prague | Olomouc, Czech Republic | Storage capacity: 4 500 m3, loading and unloading of fuels and lubricants for the territory of Moravia midland. | Design package, environmental impact assessment, procurement engineering, complex testing, geologic and geodetic survey. |
| 1999 | Jizni Mesto Construction I. | PSVS, a.s., Prague | Construction site I.Malesice-Jizni Mesto, Prague, Czech Republic | Construction of new heat distribution pipeline from boiler station Malesice to Jizni Mesto district made by pre-insulated pipe for hot water and central heating. Overall pipeline length of 2xDN800 - 700 is 8 km. | Preparation of overall documentation and services for building site approval and building permit. Detail design, operating manuals, as-built documentation, supervision. |
| 1999 | Jizni Mesto Construction II. and III. | Energotrans, a.s. | Construction site II,III Malesice Jizni Mesto, Prague, Czech Republic | Construction of new heat distribution pipeline (2xDN600-100) for hot water and central heating providing in the Jizni Mesto district. Overall length of pre- insulated pipe is 17 km. | Development application, building permit Issuing for constructions II. and III., design documentation including operating manual, as-built documentation. |
| 1999 | Independent firefighting water system RL 98025. | Ceska rafinerska, a.s. Litvinov | Litvinov, Czech Republic | Review of existing fire extinguishing system in Czech Republic, survey for a new pumping firewater station, new firewater distribution system, foam extinguishing system and construction of product tankfarm in Czech Republic. | Elaboration of BDEP, building permit documentation. |
| 1999 | Bulk fuel storage facility Chemoprojekt, a. s. | ŐMV Slovak rep., Bratislava | Velke Kostolany, Slovak Republic | Storage capacity: 4 000 m3, intake, storage and distribution of fuels on the west territory of Slovak Republic. | Design package, environmental impact assessment, subcontractor tendering, start-up assistance, geodetic and geologic survey. |
| 1999 | Coke gas desulphurization | RIA Brno for Trinec steelmill | Trinec, Czech Republic | Capacity: 37 500 Nm3/ hour. Outlet: H2S - less than 300 mg/ Nm3, NH3 - less than 35 mg/Nm3. Process licence: Krupp Uhde, SRN, VACASULF process. | Basic and detail design, complex testing, commissioning. |
| 1999 | Coking plant renewal Coke gas desulphurization | Nova Hut, a.s., Ostrava | Ostrava, Czech Republic | Capacity: 75 000 Nm3/ hour. Coke gas desulphurization: H2S - less than 300 mg/ Nm3, NH3 - less than 35 mg/ Nm3. Process licence: Krupp Uhde, SRN, AMASULF-COMBICLAUS process. | EPC (Engineering, Procurement, Construction). |
| 1998 | Relocation of two production lines | Silon Plana, a.s. | Plana nad Luznici, Czech Republic | Relocation of two production lines for polyolefins to new building including revamping of second lines. | Detail design. |
| 1998 | VVTL gas pipeline DN 1 000, section 1562 090 Brazdim - Ouholice | Transgas, s.p., Prague | Section Brazdim - Kopec, Czech Republic | Construction of new HH pressure transit gas pipeline DN1000 for natural gas transport between Brazdim - Kopec. Total length - 11 km. | Geodetic and geologic survey, hydrogeologic survey of construction, complete design documentation and negotiation with statutory authorities, conclusion of future contracting. |
| 1998 | Incinerator EPI | Chemical and Metallurgical Association, a.s. | Usti nad Labem, Czech Republic | Modification of absorption to conform the chlorine emission limit required by the Czech authorities. | Study, as-built documentation, pilot plant test. |
| 1998 | Ash handling | Assi Doman, a.s. Sepap | Steti, Czech Republic | Ash (wet) transport from new fly ash and bottom ash silos of CFB boiler K11 to the existing ash handling building. | Design documentation. |
| 1998 | Urea plant reactor revamp | Chemopetrol, a.s. Litvinov | Litvinov, Czech Republic | Reactor for production of urea. Capacity: 600 t/day. Process licence: Stamicarbon. | Study, design and engineering services. |
| 1998 | Reduction of ecological impact in Urea production plant | Chemopetrol, a.s., Litvinov | Litvinov, Czech Republic | Reduction of ammonia emission and reduction of waste water pollution caused by ammonia and urea by means of absorption, desorption and hydrolysis. Capacity: 600 t/day. | Detail design. |
| 1998 | Adding fuel catalysts into gasoline and diesel fuels | Ceska Rafinerska, a.s. | Kralupy, Czech Republic | Storage tanks for 8 kinds of additives, automatically operated truck loading. | EPC (Engineering, Procurement, Construction): tendering, supply and management of subcontractors, detail design, operating manuals , deliveries of technology, civil part and construction. Staff training, complex testing, commissioning. |
| 1998 | Fuel loading facilities for trucks | CEPRO, Prague | Slapanov, Czech Republic | Reconstruction of existing ramps for fuel loading and facilities including injection of additives. Turnover of fuels: 91 000 t/ year. | Design package, supervision, geodetic survey. |
| 1998 | Fuel loading facility | CEPRO, Prague | Smyslov, Czech Republic | Reconstruction of fuel loading ramps and facilities including injection of additives. Turnover of fuels: 77 000 m3/year. | Design package, supervision, geodetic survey. |
| 1998 | Hydrocarbon vapors recovery | CEPRO, Prague | Smyslov, Czech Republic | Hydrocarbon recovery unit. Capacity: 120 m3/hour. | Design package, supervision. |
| 1998 | Hydrocarbon vapors recovery | CEPRO, Prague | Vcelna, Czech Republic | Hydrocarbon recovery unit. Capacity: 120 m3/hour. | Design package, supervision. |
| 1998 | Reconstruction of Fuel loading station | CEPRO, Prague | Vcelna, Czech Republic | Reconstruction of fuel loading ramps and facilities including injection of additives. Turnover of fuels: 81 000 m3/year. | Design package, supervision, geodetic works. |
| 1998 | Transit gas pipeline Limuzy - Brazdim | CPP, Transgas, Prague | Section Limuzy - Brazdim, Czech Republic | 21 km long, DN1000 gas pipeline. | Layout selection, project documentation for planning office processing and building permit, detail design, supervision. |
| 1998 | Finishing of Hydrogenation plant construction | Synthesia, a.s., Pardubice | Pardubice - Semtin, Czech Republic | Finalisation and completion of unit for hydrogenation of solid particles in melt and solution. | Design documentation for building permit, detail design, supervision. |
| 1998 | Environmental precautions in Benzine handling | Barum continental | Otrokovice, Czech Republic | Hermetization of spray mixing tanks. Benzine vapours reversion. | Detail design, supervision. |
| 1998 | Stable fire suppression system. | Foster Wheeler | Steti, Czech Republic | Fire water distribution, portable and semi - stable fire extinguishing device. | EPC (Engineering, Procurement, Construction) including erection. |
| 1998 | Boiler K11 revamp | Foster Wheeler | Steti, Czech Republic | Silos 500, 800 and 1200 m3. | EPC (Engineering, Procurement, Construction) including erection of silos and fumeduct. |
| 1998 | Hydrocarbon vapours recovery | Cepro, Praha | Loukov, Czech Republic | Reconstruction of fuel tanking ramps, product additivation, Hydrocarbon vapours recovery - 120 m3/hour. Turnover of fuels: 170 000 m3/year. | Design package, supervision. |
| 1998 | Boiler K11 revamp | Assi Doman, a.s. Sepap | Steti, Czech Republic | Boiler K 11 revamp. | Documentation for planning and building permits issuing, basic and detail design. |
| 1998 | Gama - butyrobetaine unit | Synthesia, a.s. | Pardubice - Semtin, Czech Republic | Batch production of gama-butyrobetaine including material and end product storage. End product is used in production of Carnitin. | Design documentation for building permit, detail design, supervision, environmental impact assessment. |
| 1998 | Power plant - Melnik I desulphurization | Energotrans, a.s., Prague | Horni Pocaply, Czech Republic | Desulphurization of 6 blocks of Melnik I power station, production of Energo Gypsum, fly ash handling. Capacity: 6x55 MW. | Consulting and engineering services, contractor bidding and selection, contracting assistance, various activities during realisation of construction, commissioning and guarantee test. |
| 1998 | Coke gas desulphurization | Power plant Opatovice | Opatovice, Czech Republic | Desulphurization plant, fly ash handling, stabilizate production, stabilizate transport and lay out, revamp of existing unloading station, communication network, provision of discharge station Bukovina. Process licence: JGC, Kawasaki, CSI. | Feasibility study, bidding documents for tendering, checking of contractor basic and detailed design, service and start-up instructions, noise exposure impact study, environmental impact assessment, consultancy, advisory and control services, postcontract services, site supervision. |
| 1998 | Power station Porici Trutnov - Boiler K8 | CdF Ingeniere Merlebach, France | Porici u Trutnova, Czech Republic | Construction includes: boiler house, lime stone silo, electrostatic precipitator, compression station extension, electrostatic air filters. | EPC (Engineering, Procurement, Construction) of civil part - K8: detail design, project management, subcontractors tendering, procurement, civil part, construction and supervision. |
| 1997 | Pentane tank farm | Kaucuk, Kralupy | Kralupy, Czech Republic | Engineering for direct pumping of pentane from Ceska Rafinerska storage vessels, into polymerization reactors. Capacity: 500 l/min. Transport height - 65 m, length - 1300 m. | Detail design. |
| 1997 | C4 - fraction pipeline | Chemopetrol, Litvinov | Section Litvinov - Kralupy, Czech Republic | 56 km long, 150 mm dia pipeline. | Detail design. |
| 1997 | Sanitation of product pipeline and implant distribution | Benzinol Slovnaft, Bratislava | Pipeline section Slovnaft - Nova Dedinka Slovak Rep. | 800 m of interplant piping DN400 in Slovnaft, 17 km of product pipeline DN300. | Survey of existing condition, documentation for land development co-ordination office, building permit documentation, detail design, supervision. |
| 1997 | Hydrogenation plant | Synthesia, a.s., Pardubice | Semtin, Czech Republic | Complementary construction of Hydrogenation reactor. Volumes of reactors - 2x4 m3 and 1x7 m3. | Project documentation for building permit, detail designs, coordination engineering, supervision. |
| 1997 | Inventarization of actual waste water treatment system. | Ceska rafinerska, a.s. Kralupy | Kralupy, Czech Republic | Inventarization of actual waste water handling system. | Inspection of existing waste water handling system. test results elaborated in the as-built documentation. |
| 1997 | Reviewing of existing waste water management system | Ceska rafinerska, a.s. Kralupy | Kralupy, Czech Republic | Review of existing waste water management system. | Consulting services. |
| 1997 | Cooling circuit for Butadiene production | Kaucuk, Kralupy | Kralupy, Czech Republic | Capacity: 3 000 m3/hour. | Feasibility study. |
| 1997 | Boiler revamp and coal handling system revamp. | Prazska teplarenska, a.s. | Praha Malesice, Czech Republic | Reconstruction of 2 granulating plants for black coal processing and handling. Capacity: 2x160 t/hour. | Subcontractor tendering and tendering assessment, documentation for planning and building permits, supervision, engineering. |
| 1997 | Range development of heat station Holesovice | Prazska teplarenska | Praha Holesovice, Czech Republic | Civil, area and architectural management of the factory and its external links, especially Prague 7 district heating network. Investment and operating costs. | Study of the general expansion at the heat station Holesovice. |
| 1997 | New paper machine fitting - wood pulp production | Biocel, a.s. Paskov | Paskov, Czech Republic | Capacity: 30 000 t/ year of tissue paper. | Environmental impact assessment for new paper machine fitting. |
| 1997 | Isomeric linear alpha olefins (LAO production) | Spolana, a.s. Neratovice | Neratovice, Czech Republic | Fraction ratio: LAO C16/C18 = 1/1. Capacity: app. 5000 t/ year. | General reconstruction, planning and building permit documentation, basic technological specifications, design basis processing, environmental impact assessment, EPS, accident monitoring system, gas leak detection. |
| 1997 | Ammonia storage | Vitkovice, a.s., Power engineering for Spolana, a.s. | Neratovice, Czech Republic | Dismantling of existing vessel and installation of new ball vessel. Capacity: 2x1000 m3. | Detail design including control system, electrical and civil part, complex testing, operating manual, as-built documentation, design package, supervision. |
| 1997 | White gypsum separation | Precheza Prerov | Prerov, Czech Republic | Calcium sulphate resulting from the titanium white production as by-product is separated from the waste water flow and converted into commercial type of white gypsum. Capacity: 74 000 t/year. | Documents for planning and building permit, detail design, supervision. |
| 1997 | Glycol storage | Velvana, a.s. | Velvary, Czech Republic | Unloading of glycol from car-tanks, transferring into 3 tanks (capacity of each: 498 m2) and further transport to production line. | Site development plan for building permit, detail design, supervision. |
| 1997 | Power plant desulphurization, Tusimice II | CEZ, a.s., Prague | Tusimice, Czech Republic | Flue gas desulphurization (4 blocks of capacity: 200 MW each). Process licence: Chioyda Japany. | Tender documentation, contractor selection, project for planning and building permit, commercial and technical assistance, consulting services. |
| 1997 | Waste water storage | CEZ, Prague Power station Chvaletice | Chvaletice, Czech Republic | Waste water storage, desulphurization. Capacity: 2x350 m3. | EPC (Engineering, Procurement, Construction). |
| 1997 | Savage treatment facility | CSL- airport Ruzyne - North and South | Ruzyne, Czech Republic | Rain and sewage water treatment. Capacity: 80 + 100 m3/ hour. Actual efficiency : 87 - 93 % (BSK5). | Technical-investment study, design package: basic and detail design (civil part), supervision, commissioning. |
| 1997 | Environmental impact assessment | Various clients (Czech Republic) | Various | Energetic and chemical industry, gas processing, pulp and paper industry, environmental constructions. | Environmental impact assessment. |
| 1997 | Coke gas desulphurization | Power plant Chvaletice | Chvaletice, Czech Republic | Desulphurization using wet limestone process. Capacity: 4x200 MW. | Bidding documents for tendering, postcontract services. |
| 1997 | Fly ash handling | CEZ, Prague Power plant Melnik | Horni Pocaply, Czech Republic | Fly ash handling, transport and storing in silos (2x6000 m3), mixing of fly ash with water and conveying to the rail. Capacity: 432 t/year. | EPC (Engineering, Procurement, Construction). |
| 1997 | Coke gas desulphurization | Power plant Detmarovice | Detmarovice, Czech Republic | Desulphurization using wet limestone process, stabilizate production, transport and lay up. Process licence: Mitsubishi. | Bidding documents for tendering, planning and building permit documentation, consulting service, postcontract services. |
| 1997 | Coke gas desulphurization | Power plant Vojany | Vojany, Czech Republic | Fluidised bed boiler. | Bidding documents for tendering, contract adjustment, planning and building permit documentation. |
| 1997 | Coke gas desulphurization and gypsum handling | Energotrans, a.s. Prague CEZ a.s. | Horni Pocaply, Czech Republic | EME I: optimisation of ecology, waste treatment, plot plan, railway capacity. EME II: utilisation of energy gypsum, ash handling and transport, limestone milling. | Study, bidding documents for tendering, dispersion study, preparation of the site. |
| 1997 | Heating plant desulphurization | CHZ Litvinov | Litvinov, Czech Republic | Desulphurization by wet limestone process, boiler K13 to K17 revamp, sludge incineration 700. Capacity: 200 MW. Process licence: Bischoff. | Subcontractor selection, building permit documentation, documentation of civil part, noise exposure and dispersion study, environmental impact assessment, process coordination, stabilizate production procurement. |
| 1996 | Biodiesel unit | Agropodnik a.s. Dobronín | Jihlava, Czech Republic | Glycerine production 60%, 2000 t/year. Technology: Agro. | EP, DD |
| 1996 | Fire safety evaluation study for petrochemical complex | Chemopetrol, a.s Litvinov | Litvinov, Czech Republic | Petrochemistry objects - polyolefin section. | Fire hazard analysis in compliance with Czech fire codes. |
| 1996 | Phosphate fertiliser filtration | Fosfa, Breclav- Postorna | Postorna Czech Republic | Filter press of dinatrium - hydrogen - phosphate suspension and filter press of neutralising calcium and phosphoric sludge. Capacity: 5 t/h. | Design package, supervision. |
| 1996 | Fire hazard analyses | Koramo, Kolin | Kolin, Czech Republic | Mineral oil refinery. | Fire hazard study in compliance with the Czech codes. (Code No.: 91/1995 Sb, documentation elaborated in the scope specified by the code No.: MV 21/1996 Sb.) |
| 1996 | Cooling system revamp | Ceska rafinerska, a.s. Kralupy | Kralupy, Czech Republic | Capacity: 10 000 m3/hour. | Optimisation study. |
| 1996 | Acetylene production and loading | Aga Gas, Prague | Kladno Czech Republic | Capacity: 1 000 t/year. | Study + environmental impact assessment for implementation of technology. basic construction specifications, mechanical and technology layout, electro part. |
| 1996 | Stabilizate production | Chemopetrol, a.s. | Litvinov, Czech Republic | Ash and gypsum mixing and storage. Stabilizate handling and disposal. Capacity: 2x90 t/hour of stabilizate. | EPC (Engineering, Procurement, Construction), apart from civil part. |
| 1996 | Oily water separation system for Slapy dam | CEZ Prague | Slapy, Czech Republic | Sewage water treatment plant.¨Capacity: 200 t/day. | Basic and detail design, site supervision. |
| 1996 | Waste water treatment from biodiesel production. | Milo, Olomouc | Olomouc, Czech Republic | Biological waste water treatment plant. Capacity: 15 t/day. | Basic and detail design, site supervision. |
| 1996 | Paper machine reconstruction | KRPA Krkonosske papery, a.s. | Hostinne, Czech Republic | Paper machine reconstruction. I. stage: speed increasing up to 400 m/min, outlook for the future 500 m/ min. | Detail design, co-ordination and engineering services, supervision, as-built documentation. |
| 1996 | Desalination plant | Diamo, Straz pod Ralskem | Straz pod Ralskem, Czech Republic | Decontamination of acidic underground waste water resulting from underground leaking of Uranium ores by means of reverse electrodialysis, evaporation and crystallisation. Capacity: 330 m3/hour of purified water. | Basic and detail design, engineering supply. |
| 1995 | Crude oil pipeline IKL | Mero ILK, Prague | Ingolstadt (SRN)-Kralupy -Litvinov, Czech Rep. | Czech section 168 km long (total length - 340 km), 700 mm diameter pipeline. management system, one part ends in Kralupy pump station, another end in Kralupy and Litvinov refinery. | Detail design, pressure and strength test, complex geodetic support, property engineering. |
| 1994 | Distribution station 110 kW | Power plant Pocerady | Pocerady, Czech Republic | Delivery of distribution point 100 kW and main pipe rack. | EPC (Engineering, Procurement, Construction). |
| 1994 | Biodiesel unit | MILO Olomouc, Czech Republic | MILO Olomouc, Czech Republic | Vogel & Noot process. Batch process. Capacity: 30 000 MTPY. | EPC (Engineering, Procurement, Construction). |
| 1994 | Flue gas desulphurization | Power plant Pocerady | Pocerady, Czech Republic | Desulphurization by wet limestone process, lay up of limestone, energy-gypsum production. 2. Construction: 2x200 MW 3. Construction: 1x200 MW Process licence: Hoogvens. | Study, bidding documents for tendering, documentation for planning and building permit, selection of contractor, dispersion study. |
| 1993 | Boiler K1 and K2 desulphurization | Heating plant Plzen | Plzen, Czech Republic | Desulphurization by semi-dry limestone process. | Bidding documents for tendering. |
| 1993 | Coke gas desulphurization | Bischoff | Prunerov, Czech Republic | Process licence: Bischoff. | Elaboration of selected parts of design documentation. civil part and selected mechanical parts. |
| 1993 | Coke gas desulphurization | Power plant Prunerov | Prunerov, Czech Republic | Capacity: 5x210 MW , desulphurization by wet limestone process, ENERGO gypsum production. Process licence: Mitsubishi. | Project documentation ,consultancy and engineering services, contractor tendering and selection, contracting assistance. |
| 1993 | Coke gas desulphurization | Power plant Prunerov I | Prunerov, Czech Republic | Capacity: 4x110 MW, desulphurization by wet limestone process, ENERGO gypsum production. Process licence: Bischoff. | Contractor bidding and selection, documents for planning and building permit, contracting assistance. |
| 1990 | Repository | Nuclear Power station Mochovce | Mochovce, Czech Republic | Low radiance deposit. | Complete design package. |